SONG CONG 2 IP - PHASE 2 - THAI NGUYEN PROVINCE

New Industrial Park in Thai Nguyen

Ceremony of granting Investment Certificate of Song Cong 2 Industrial Park - Phase 2 to Viglacera Thai Nguyen.

Developer:
Viglacera Thai Nguyen Joint Stock Company
Viglacera Corporation - JSC

The project to invest in construction and business of infrastructure of Song Cong 2 Industrial Park - Phase 2, Thai Nguyen province was signed the Investment Approval Decision by the Deputy Prime Minister Le Minh Khai on March 7, 2024. The implementation location is in Ba Xuyen commune and Tan Quang commune, Song Cong city, Thai Nguyen province, divided into two zones: Zone 1 and Zone 2
– Zone 1 has an area of ​​175.52 hectares, located in the administrative boundary of Tan Quang commune and part of Ba Xuyen commune, Song Cong city.
– Zone 2 has an area of ​​120.72 hectares, located in the administrative boundary of Ba Xuyen commune and part of Tan Quang commune, Song Cong city.
The project is expected to be completed within 36 months from the date the State hands over the land, with a total estimated investment capital of VND 3,985.47 billion, of which the investor's contributed capital is VND 597.82 billion.

Location of Song Cong 2 IP - Phase 2, Thai Nguyen province.

Advantages of the Industrial Park
- The synchronous transport system includes railways, waterways, roads (Hanoi - Thai Nguyen railway, Hanoi - Thai Nguyen expressway, National Highway 3, Da Phuc port cluster), and Ring Road 5, creating a convenient transport network for circulation and socio-economic development of the city.
- Relatively flat terrain, abundant labor resources.
- When the industrial land fund of Thai Nguyen province is not much left, this will be the destination for enterprises in Thai Nguyen or neighboring areas that wish to expand.

Main investment sectors in the Industrial Park:
Prioritize develop electronics, telecommunications industries, pharmaceuticals, supporting technology, new materials, clean energy industry,... and other suitable sectors according to local planning.

Methods for lease:
- Sublease the land with available infrastructures
- Lease the available warehouses
- Lease the housing for workers

Distances from Song Cong 2 Industrial Park - Phase 2 to:
• Hanoi – Thai Nguyen Expressway: 3 km (5')
(Via Song Cong Interchange)
• Thai Nguyen City: 10 km (10')
• Center of Hanoi: 65 km (50')
• Noi Bai Airport: 45 km (40')
• Cat Bi Airport: 165 km (2h15')
• Hai Phong Port: 170 km (2h20')
• Cai Lan Port: 200 km (2h40')

The Industrial Park is adjacent to the Ring Road No. 5:
Ring Road 5 is planned to create a circulation between 8 provinces of Hanoi - Vinh Phuc - Thai Nguyen - Bac Giang - Hai Duong - Thai Binh - Ha Nam - Hoa Binh and will be built before 2030.

Traffic

The main road of the Industrial Park has a road width of 36m, the branch roads have road widths of 28.5m and 22.5m, are built in a square grid, ensuring convenient access to the land.

Technical infrastructure

Power supply system

Power is supplied from the national grid through two 110/22 KV substations with a total capacity of 3x63 MVA and one transmission 110 KV substation with a capacity of 50 MVA.

Water supply system

Zone 1: The IP is supplied with water from Song Cong Water Plant and Tich Luong Water Plant with a capacity of 7,200 m3/day and night. Zone 2 is supplied with a water supply station having a capacity of 9,000 m3/day and night.

Fire protection

Water supply system for fire protection is located along road lines. The distance between fireplugs is from 120 m to 150 m. The fire-fighting pillar diameter is D125mm.

Drainage system

Rain water drainage system is constructed separately with wastewater drainage system. The diameter of underground rain-water drainage pipe is D800mm (minimum) with the principle of automatic drainage.

Wastewater treatment system

Wastewater treatment station has a capacity of 6,000 m3/day. The diameter of wastewater drainage pipe is D300mm.

Telecommunication system

The main signal source is taken from the switchboard in Thai Nguyen city, through the incoming trunk line to satellite stations provided to the Industrial Park, ensuring the Industrial Park's operation according to the regulations.

Social infrastructure & Services

IP security

Security guard ensures security inside the Industrial Park.

Banks

Vietnam Joint Stock Commercial Bank for Industry and Trade is 3 km from the Industrial Park.

Post office

The post office brand is 3 km from the Industrial Park.

Customs

Thai Nguyen's Customs Office is 12km from the Industrial Park.

Hospitals

Thai Nguyen Central Hospital is in Thai Nguyen City.

Petro Stations

The petro station is built right in the Industrial Park.

Social Housing Area

The 51.94-hectare housing area located next to the Industrial Park and the 15.55-hectare housing area 1.5 km from the Industrial Park provide accommodation, service facilities, and public utilities for workers in the Industrial Park.

  • Taxation of corporate income tax rate is 20%
  • Exempt CIT for the first 2 years
  • Decrease 50% for the next 4 years

PHOTO

VIDEO

TOP