SONG CONG 2 INDUSTRIAL PARK - PHASE 2

Investor:

  • Viglacera Thai Nguyen Joint Stock Company
  • Viglacera Corporation - JSC

Scale: 296ha

  • Zone 1: 175.52 ha
  • Zone 2: 120.72 ha

Operational Time: 2024 - 2074

Industrial Park Advantages

  • 01Prime location, adjacent to the Hanoi - Thai Nguyen highway.
  • 02Swift connection to key electronics, semiconductor, automotive projects in Thai Nguyen, Bac Ninh, Bac Giang, Vinh Phuc, etc.
  • 03Favorable geological condition - hill soil, helping reduce construction costs.
  • 04Stable power supply with high capacity.
  • 05Abundant & high-quality labor source, trained for electronics, semiconductors, AI industries.

Swift connection to key electronics, semiconductor, and automotive projects in the provinces of Thai Nguyen, Bac Ninh, Bac Giang, Vinh Phuc, etc.

Internal Traffic

The transportation network in the industrial park is designed in a grid layout for optimal access to development sites

 

The industrial park has an abundant power supply.

Technical Infrastructure

 

Power Supply

Electricity is supplied from the national grid through 2 110/22KV transformer substations with a total capacity of 6 x 63 MVA & 1 Sông Công 2 110 KV transformer substation with a capacity of 50 MVA.

Water Supply

Water is supplied from the Sông Công Water Plant & Tích Lương Water Plant with a capacity of 7,200 m³/day and the industrial park's water supply station with a capacity of 9,000 m³/day.

Wastewater Treatment

The wastewater treatment station has a capacity of 6,000 m³/day.

Telecommunication

The IP telecommunications system meets international standards and is equipped for high-speed communication and data transmission.

Drainage system

The IP has a separate rainwater drainage system, consisting of underground pipes with a minimum diameter of D800mm, designed for automatic drainage.

Social Infrastructure and Services

 

Security

The security guard ensures security inside the IP.

Fire Protection

The firefighting water supply system is installed along the roadways of the IP.

Gas station

The gas station is built right in the industrial park.

Bank

Vietinbank is located 3 km from the industrial park.

Post Office

The post office is located 3 km from the industrial park.

Customs Office

The Thai Nguyen Customs Department is located 12 km from the industrial park.

Corporate income tax (CIT) is 20%
Corporate income tax exemption for the first 2 years
50% reduction for the next 4 years

PHOTO

VIDEO

TOP