Investor:
Scale: 296ha
Project Duration: 2024 - 2074
Industrial Park Advantages
The drainage system in the industrial park is built separately from the wastewater drainage system, using underground culverts with a minimum diameter of D800mm, operating on the principle of gravity flow.
The security team ensures order and safety within the industrial park.
The fire fighting water supply system is arranged along the roads.
The gas station is built right in the industrial park.
The Vietnam Joint Stock Commercial Bank for Industry and Trade is located 3 km from the industrial park.
The post office branch is located 3 km from the industrial park.
The Thai Nguyen Customs Department is located 12 km from the industrial park.