SONG CONG 2 INDUSTRIAL PARK - PHASE 2

Investor:

  • Viglacera Thai Nguyen Joint Stock Company
  • Viglacera Corporation - JSC

Scale: 296ha

  • Zone 1: 175.52 ha
  • Zone 2: 120.72 ha

Project Duration: 2024 - 2074

Industrial Park Advantages

  • 01Convenient transportation location, adjacent to the Hanoi - Thai Nguyen Expressway
  • 02Quickly connects to major electronic, semiconductor, automotive, and manufacturing hubs in Thai Nguyen, Bac Ninh, Bac Giang, and Vinh Phuc
  • 03Good geological foundation - hilly terrain, helping save construction costs
  • 04Stable electricity supply with high capacity
  • 05Abundant, high-quality labor force trained in electronics, semiconductor industry, and artificial intelligence.

Quick connection to major electronics, semiconductor, automotive, and manufacturing hubs in Thai Nguyen, Bac Ninh, Bac Giang, and Vinh Phuc.

Internal Transportation

The transportation routes within the industrial park are planned in a grid layout, ensuring convenient access to construction plots.

The industrial park has an abundant power supply.

Technical Infrastructure

Power Supply System

Electricity is supplied from the national grid through 2 110/22KV transformer substations with a total capacity of 6 x 63 MVA & 1 Sông Công 2 110 KV transformer substation with a capacity of 50 MVA

Water Supply System

Water is supplied from the Sông Công Water Plant & Tích Lương Water Plant with a capacity of 7,200 m³/day and the industrial park's water supply station with a capacity of 9,000 m³/day.

Wastewater Treatment System

The wastewater treatment plant has a capacity of 6,000 m³/day.

Telecommunication System

The telecommunications system meets international standards and is always ready to meet the needs of high-speed communication and data transmission.

Drainage system

The drainage system in the industrial park is built separately from the wastewater drainage system, using underground culverts with a minimum diameter of D800mm, operating on the principle of gravity flow.

Social Infrastructure and Services

Security KCN

The security team ensures order and safety within the industrial park.

Fire Prevention and Fighting System

The fire fighting water supply system is arranged along the roads.

Gas station

The gas station is built right in the industrial park.

Banking Services

The Vietnam Joint Stock Commercial Bank for Industry and Trade is located 3 km from the industrial park.

Post Office

The post office branch is located 3 km from the industrial park.

Customs Office

The Thai Nguyen Customs Department is located 12 km from the industrial park.

Corporate income tax exemption for the first 2 years
50% reduction for the next 4 years
Corporate income tax is 20%